The Pharmaceutical Inspection Co-operation Scheme (PIC/S) writes the GMP rulebook that 57 inspectorates, including the FDA and EU national regulators, use when they walk into a plant. In 2026 it revised Annex 19, issued a rewritten qualification and validation guide and began extending Annex 15 to API makers. Most changes are incremental, but the Annex 15 revision will put chemical and biological active substance sites under binding validation rules for the first time.
PIC/S GMP Guide revisions: latest updates
- Oct 28, 2026: PIC/S recommendation PI 058-1, which explains the most important changes in the 2022 sterile Annex 1, entered into force after a joint PIC/S, EMA and WHO working group prepared it.
- Oct 1, 2026: The revised Recommendations on Qualification and Validation (PI 006-4) took effect, replacing the 2007 edition and growing from 26 to 49 pages.
- Sep 24, 2026: The revised GMP Guide, PE 009-18, entered into force with a revised Annex 19 on reference and retention samples, two days after the PIC/S Committee adopted it.
- Jul 15, 2026: EMA and PIC/S reset the Annex 15 timetable: a draft goes to consultation in December 2026, with publication and PIC/S adoption planned for April 2028.
PIC/S GMP Guide revisions at a glance
| Region | Global (PIC/S Participating Authorities, including the EU, US, UK, Japan, Brazil and Australia) |
| Instrument | PIC/S GMP Guide PE 009-18 (revised Annex 19); recommendation PI 006-4; draft revisions of Annex 15 and Chapter 1 |
| Legal status | Annex 19 and PI 006-4 in force; Annex 15 and Chapter 1 revisions in draft |
| Key dates | Sep 24, 2026: PE 009-18 in force. Oct 1, 2026: PI 006-4 in force. Dec 2026: Annex 15 draft consultation. Apr 2028: Annex 15 publication target |
| Most exposed | Chemical and biological API makers; CDMOs inspected by PIC/S members; sterile and multi-product sites |
| Official source | PIC/S: Revision of PIC/S GMP Guide (PE 009-18) |
| PharmaSource Score | 144 Impact 3, Reach 6, Likelihood 8 Download the PharmaSource Regulatory Radar |
What the PIC/S GMP Guide revisions are
PIC/S is a co-operation of medicines inspectorates, and its GMP Guide is kept equivalent to the EU GMP Guide. Part I covers finished products, Part II covers active substances used as starting materials, and the annexes apply to both. Members transpose each revision into national rules, so a change in Geneva reaches inspections in dozens of countries. Non-EEA authorities and applicants have been invited to transpose the new Annex 19 into their own guides.
- Annex 19 (reference and retention samples): The revision mainly rewrites Section 9 on samples for parallel imported, distributed and traded products, and aligns PIC/S with the EU text that took effect the same week.
- PI 006-4 (qualification and validation): The new recommendation applies a lifecycle, risk-based approach throughout. It treats the three consecutive validation batches in Annex 15 as a transitional provision and asks companies to justify batch numbers scientifically.
- Cleaning validation: PI 006-4 adds guidance on health-based exposure limits, worst-case selection, manual cleaning and ongoing cleaning verification.
- Annex 15 (draft): The planned revision would make Annex 15 binding on chemical and biological API makers, who now use it only as optional guidance, and align it with ICH Q9(R1) on quality risk management.
- Chapter 1 (draft): A joint EU and PIC/S revision of the pharmaceutical quality system chapter went to consultation from September 3 to December 3, 2025.
Where the PIC/S GMP Guide revisions stand
The Annex 15 change grew out of the sartan nitrosamine crisis. EMA’s lessons-learnt work found weak process and product knowledge, inadequate investigations and poor contamination control at API sites, and recommended making Annex 15 mandatory for them. The concept paper drew comments from groups including the ECA Validation Group before the timetable was pushed back. Membership keeps growing: Jordan became the 57th Participating Authority on January 1, 2026, and China, Kazakhstan and Uzbekistan have applied.
- Dec 3, 2025: Chapter 1 consultation closes.
- Feb 9 to Apr 9, 2026: Annex 15 concept paper consultation.
- Jul 30, 2026: PI 006-4 published.
- Sep 24, 2026: PE 009-18 with revised Annex 19 in force.
- Nov 2, 2026: PIC/S Committee meets in Istanbul and adopts a revised PIC Scheme.
- Dec 2026 to Mar 2027: Draft Annex 15 out for a three-month consultation.
- Apr 2028: Planned European Commission publication and PIC/S adoption of revised Annex 15.
What the PIC/S GMP Guide revisions mean for manufacturing and outsourcing
PIC/S texts rarely force new equipment, but they change what inspectors ask for. PI 006-4 is a recommendation, yet it reflects the current expectations of PIC/S inspectorates, so validation files will be judged against it from now on.
- API makers and API CDMOs: Expect Annex 15 to become a direct inspection reference, with a Validation Master File, a qualification and validation policy, formal change control and investigation of any result that fails its acceptance criteria. Sites in India and China that supply EU and other PIC/S markets will be inspected against it.
- Sponsors: Finished-product makers and their Qualified Persons will need to confirm that API suppliers meet the revised expectations, which means tighter quality agreements and more validation evidence in supplier audits.
- Multi-product CDMOs: The cleaning validation guidance, built around health-based exposure limits and ongoing verification, raises the bar for shared equipment.
- Sterile manufacturers: PI 058-1 gives inspectors a common reading of Annex 1, reducing the gap between how different authorities apply contamination control rules.
- Outsourced validation: The Annex 15 draft would set clearer expectations for validation work done by contractors, so manufacturers keep control of studies they outsource.
For outsourcing leaders, the practical step is to ask API suppliers and CDMOs for a gap assessment against PI 006-4 and the Annex 15 concept paper now, and to build validation and cleaning evidence requirements into quality agreements before the draft lands in December.
Why supporters back the PIC/S GMP Guide revisions
“Address the shortcomings identified and ensure quality and safety of medicines.”
EMA GMP/GDP Inspectors Working Group and PIC/S, Annex 15 concept paper
- Lessons from nitrosamines: The sartan contamination exposed gaps in process knowledge at API sites, and binding validation rules target that weakness directly.
- One standard across markets: Joint EU and PIC/S drafting keeps the two guides equivalent, so a site prepares for one rulebook instead of several.
- Science over convention: PI 006-4 replaces the habit of three validation batches with a justified, risk-based number.
- Wider reliance: Regulators such as Brazil’s ANVISA use PIC/S membership as a test for relying on foreign inspections, so common standards cut duplicate audits.
Criticisms of the PIC/S GMP Guide revisions
“Inconsistencies in the glossary of the current version of Annex 15.”
ECA Validation Group, comments on the Annex 15 concept paper, GMP-Compliance.org
- Unclear terms: The ECA Validation Group asked for the new term “Validation Master File” to be defined, since it appears in neither the GMP guidelines nor the annexes.
- Guidance that acts like law: PI 006-4 is formally a recommendation, but inspectors will use it, which blurs the line between binding rules and expectations.
- Uneven timing: Each of the 57 authorities transposes revisions on its own schedule, so a global supplier can face different versions in different inspections.
- Revision overload: Annex 1, Annex 15, Chapter 1 and the EU’s digital rewrite of Annex 11 and new Annex 22 are moving at once, which can stretch quality teams at smaller API makers.
What’s next for the PIC/S GMP Guide revisions
- Annex 15 draft, December 2026: The first full text will show how far binding validation rules reach into API sites, with comments due by March 2027.
- Chapter 1 final text: Adoption of the revised quality system chapter would bring ICH Q9(R1) risk management into the core of the guide.
- Membership: China’s NMPA application, under rapporteur Jacques Morénas of France’s ANSM, would bring the world’s largest API producer under PIC/S standards if it succeeds.
- Our score: Impact 3, because the revisions raise inspection expectations without forcing site changes. Reach 6, because they apply to every site under PIC/S member inspectorates. Likelihood 8, because final texts are expected while member adoption dates vary. That gives a PharmaSource Score of 144.
Related articles
- EU GMP Annex 11 and Annex 22: What the Digital Rewrite Means for Contract Manufacturing
- ICH Q1 Explained: Biologics, ATMPs and Modeling Come Under One Stability Rulebook
- Brazil ANVISA GMP Reliance: How IN 451 Cuts the Wait for Foreign Plant Certification
- FDA Foreign Inspections and PreCheck: Tougher Scrutiny Abroad, a Fast Lane at Home
- India Schedule M and PLI: Tougher GMP Rules Meet a Slow-Paying API Subsidy