CDMO News

Grand River Aseptic Manufacturing Expands with New 150,000 sq. ft. Facility

  • Grand River Aseptic Manufacturing (GRAM) announces its third world-class facility in five years.
  • The new 150,000 sq. ft. syringe and cartridge filling center is expected to be fully operational by 2026.

Grand River Aseptic Manufacturing (GRAM), a sterile injectable contract manufacturer of biologics, small molecules, and vaccines, has announced the construction of its third world-class facility in five years. The new 150,000 sq. ft. syringe and cartridge filling center is designed to provide greater capacity for the industry’s growing biologics pipeline and the growth in advanced drug delivery systems for patient self-administration.

The new center, currently under construction, is strategically positioned as part of GRAM’s extended Grand Rapids campus. It is adjacent to GRAM’s existing 200,000 sq. ft. finishing and warehouse center. This expansion brings the CDMO to five manufacturing facilities and more than 450,000 sq. ft. of production space.

The facility is designed to hold up to four syringe/cartridge filling and inspection lines. By enhancing capacity, the new center will complement GRAM’s existing syringe and cartridge filling line. GRAM estimates that building construction will be complete in 2025, with new filling and inspection equipment installed in 2026.

Increasing capacity for a growing market

The PharmaSource Podcast recently interviewed David Powell, Vice President of Business Development at GRAM about their strategy to increase capacity in fast-growing biologics fill-finish space. Listen to the full interview here:

“Demand for high-quality syringe and cartridge filling has never been greater, and we are thrilled to be able to add more capacity and meet more demand,”

said Tom Ross, President and CEO of Grand River Aseptic Manufacturing.

“Designing the filling center with space for future equipment positions us favorably to serve evolving client needs for years to come.”

Exclusive roundtable with GRAM

Don’t miss the interactive roundtable that Grand River Aseptic Manufacturing are hosting at CDMO Live.

The roundtable explores strategies to foster strong partnerships with contract manufacturers, and will explore insights into effective collaboration models, communication channels, and mutual expectations.

Join this roundtable to:
– Understand the critical role of trust and transparency in CDMO-sponsor relationships.
– Identify key success factors for long-term partnerships.
– Learn how to navigate challenges and resolve conflicts.

Sign up today for your ticket to CDMO Live

Sign up to the free weekly newsletter for all the latest news, resources and podcasts in contract manufacturing.  Register here

CDMO Live is the ultimate event for BioPharma outsourcing
Join us June 13th 2024 for this exclusive online event. Register now for your free ticket and connect with leading insights and CDMO partners. 

The Science of Partnering

CDMO Live is the ultimate online event for bio/pharma outsourcing

Discover the latest trends and best practices in contract manufacturing, and connect with leading partners. 

LIVE on June 13 2024    Register today

Who do you rate?
Recommend a Supplier

Help us find the most innovative and trusted suppliers in Pharma and Biotech.